JLS

smart solutions 866-774-9737

St. George Medical Center

Client Name: St. George Medical Center
Client Address: 6620 Coyle Avenue, Carmichael, CA

Job Type: Hospital

Scope of Work: Surface Preparation, Water Vapor and Alkalinity Control System, Underlayment

Project Size: approximately 11,000 square feet

Project Highlights: This project was time sensitive with an extreme sloping and humping floors. We floated this floor from a ¼” up to a 2”float to level.

You are here: Home Floor Prep/ Coatings Case Studies St. George Medical Center